1.Monthly
• check general physical condition.
• check last servicing date of liferaft & HRU.
• ensure painter connected to weaklink & connected to deck.
• no obstruction for automatic launching arrangement.
2. Annually
• shore based maintenance of liferaft & HRU.
• this may be extended by 6 months by the administration.
Maintenance of Rescue boat
1. Weekly
• visual inspection every week
• test the engine.
2. Monthly
• launch in water & manoeuvre.
3. Annually
• onload release mechanism to be operationally tested.
• survey as lifeboat.
• inflated rescue boat servicing as per manufacturers instructions.
No comments:
Post a Comment